Email exchange · 9 September 2026 – 11 September 2026

Nearby homes, screening and construction noise

A resident asked for a larger gap between homes and the solar farm, and raised questions about screening, drainage and construction.

Names, contact details and home-location references have been removed. Forwarding details, repeated emails and standard footers are omitted. Images referred to in the emails are not included in this transcript.

What the resident asked

In a note shared on 10 October, the resident also questioned whether the temporary construction compound behind nearby homes would have a noise barrier. They were concerned about noise and visual disruption during construction.

  • Could the panels nearest homes be removed, leaving a larger undeveloped gap?
  • How far would panels and equipment be from homes, and what guidance supported those distances?
  • Would screening work from gardens and upstairs windows, including in winter?
  • How would drainage, road widening and construction traffic affect homes and existing wastewater infrastructure?
  • Where would noisy equipment be, what were the construction hours and routes, and which hedgerows or walls would be removed?
  • Would there be a separate benefit scheme for the nearest households? The resident said this was separate from their planning concerns.

What Blackthorn answered

  • Blackthorn said an alternative layout had not been assessed because it had no other land under agreement outside the site boundary.
  • It said hedgerows would take 3–4 years to reach about 3–4 metres, and that screening was intended to reduce views rather than make the development invisible.
  • It described drainage, access, noise and landscaping reports as being prepared. It said a traffic management plan would be agreed with the Council if permission was granted.
  • It said there would be a locally administered Community Benefit Fund, rather than a separate direct-payment scheme for the nearest households.
  • On 11 September it said measurement graphics were attached and a 2.6-metre timber noise barrier had been added following feedback. The reply does not identify which equipment or areas that barrier would cover.

The emails, from first to last

Email exchange: page images

Open an image to see it at full size. The same wording is available as readable text above.

Page 1 of 8 — open full-size image
Redacted email exchange with Blackthorn Solar Farm, page 1 of 8. Full text is above.
Page 2 of 8 — open full-size image
Redacted email exchange with Blackthorn Solar Farm, page 2 of 8. Full text is above.
Page 3 of 8 — open full-size image
Redacted email exchange with Blackthorn Solar Farm, page 3 of 8. Full text is above.
Page 4 of 8 — open full-size image
Redacted email exchange with Blackthorn Solar Farm, page 4 of 8. Full text is above.
Page 5 of 8 — open full-size image
Redacted email exchange with Blackthorn Solar Farm, page 5 of 8. Full text is above.
Page 6 of 8 — open full-size image
Redacted email exchange with Blackthorn Solar Farm, page 6 of 8. Full text is above.
Page 7 of 8 — open full-size image
Redacted email exchange with Blackthorn Solar Farm, page 7 of 8. Full text is above.
Page 8 of 8 — open full-size image
Redacted email exchange with Blackthorn Solar Farm, page 8 of 8. Full text is above.

← All correspondence